混凝土攪拌車(chē)更好攪拌需要從攪拌時(shí)間、攪拌速度、攪拌順序、攪拌容量和攪拌器結構等方面來(lái)考慮,下面來(lái)進(jìn)行詳細的解答:
Better mixing by concrete mixer trucks requires consideration from aspects such as mixing time, mixing speed, mixing sequence, mixing capacity, and mixer structure. Here are detailed answers:
攪拌時(shí)間:攪拌車(chē)的攪拌時(shí)間應該根據混凝土的種類(lèi)和配合比來(lái)確定,一般來(lái)說(shuō),攪拌時(shí)間應該在1-3分鐘之間,過(guò)長(cháng)或過(guò)短的時(shí)間都會(huì )影響混凝土的質(zhì)量。
Mixing time: The mixing time of the mixer truck should be determined based on the type and mix ratio of concrete. Generally speaking, the mixing time should be between 1-3 minutes, and too long or too short a time can affect the quality of concrete.
攪拌速度:混凝土攪拌車(chē)的攪拌速度應該根據混凝土的種類(lèi)和配合比來(lái)確定,一般來(lái)說(shuō),攪拌速度應該在2-6轉/分鐘之間,過(guò)快或過(guò)慢的速度都會(huì )影響混凝土的質(zhì)量。
Mixing speed: The mixing speed of a concrete mixer truck should be determined based on the type and mix ratio of concrete. Generally speaking, the mixing speed should be between 2-6 revolutions per minute. Too fast or too slow speed can affect the quality of concrete.
攪拌順序:攪拌車(chē)的攪拌順序應該先將水和粉料攪拌均勻,再加入骨料進(jìn)行攪拌,很后再進(jìn)行一段時(shí)間的混合,以保證混凝土的質(zhì)量。
Mixing sequence: The mixing sequence of the mixer truck should first mix the water and powder evenly, then add the aggregate for mixing, and then mix for a period of time to ensure the quality of the concrete.
攪拌容量:攪拌車(chē)的攪拌容量應該根據車(chē)輛的實(shí)際載重能力來(lái)確定,避免因為超載而導致攪拌不均勻或者混凝土質(zhì)量下降。
Mixing capacity: The mixing capacity of the mixer truck should be determined based on the actual load capacity of the vehicle to avoid uneven mixing or degradation of concrete quality due to overloading.
攪拌器結構:混凝土攪拌車(chē)的攪拌器結構應該合理設計,攪拌葉片應該均勻分布,并且具有合適的形狀和角度,以保證混凝土的攪拌均勻。
Mixer structure: The mixer structure of the concrete mixer truck should be reasonably designed, and the mixing blades should be evenly distributed with appropriate shapes and angles to ensure uniform mixing of concrete.
此外混凝土攪拌車(chē)水箱的水量要經(jīng)常保持裝滿(mǎn),以備急用,冬季停機后,應將水箱、水泵、水管、攪拌筒內的水放凈,并停放在朝陽(yáng)、不積水的地方,以免凍壞機械。
In addition, the water volume in the water tank of the concrete mixer truck should always be kept full for emergency use. After shutdown in winter, the water in the water tank, water pump, water pipe, and mixing drum should be drained completely, and parked in a sunny place without accumulated water to avoid freezing and damaging the machinery.
在檢查、修理攪拌車(chē)液壓傳動(dòng)部分時(shí),應使發(fā)動(dòng)機和液壓泵在沒(méi)有壓力的情況下進(jìn)行。在調整混凝土攪拌車(chē)各部間隙、行程、壓力時(shí),應由專(zhuān)職員檢查同意;更換機件時(shí),必須由部長(cháng)或主管經(jīng)理簽字,否則出現問(wèn)題后追究有關(guān)人員責任。
When inspecting and repairing the hydraulic transmission part of the mixer truck, the engine and hydraulic pump should be operated without pressure. When adjusting the clearance, stroke, and pressure of each part of the concrete mixer truck, it should be checked and approved by a full-time safety officer; When replacing machine parts, it must be signed by the director or the manager in charge, otherwise the relevant personnel will be held responsible after any problems occur.
總之,只有在這些方面做到充分考慮和細致把握,才能確?;炷翑嚢柢?chē)的攪拌質(zhì)量和穩定性。您有需求就來(lái)我們網(wǎng)站http://www.apstzs.com咨詢(xún)!
In short, only by fully considering and carefully grasping these aspects can the mixing quality and stability of the concrete mixer truck be ensured. Come to our website if you have any needs http://www.apstzs.com consulting service